Placing Into Operation; Installation Location - WAGNER Plast Coat PC 25 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

GB

PLACING INTO OPERATION

7
PLACING INTO OPERATION

Installation location

Position mortar spraying machine in a level position to pre-
vent it from sliding away.
Compressor (accessory)
Attach compressor holder to the mortar spraying machine.
Place compressor onto holder and secure with screws. Con-
nect compressor to power supply.
Connecting mortar hose
• Check that the outlet unit (1, fig. 10) is seated firmly. If neces-
sary tighten star grips (2) by hand.
• Connect mortar hose (3) and secure with tension levers (4).
• Screw remote control to connection (5) on the control unit.
• Connect atomization air connection (6) on mortar hose to
the compressed air supply or compressor (accessory).
6
36
5
2
1
4
3
Connecting spray lance (fig. 11)
• Select a spray tip suitable for the material:
The tip size should amount to at least three times the
granular size, e.g.
granular size artificial resin plasters –> 3 mm
Tip size –> 10 mm
• Mount the texture tip (1) in the spray lance with the cone
pointing towards the spray head.
• Connect the spray lance (2) to the material hose and secure
by applying the levers (3).
• Close the material tap (4) (material tap points forwards).
• Connect atomization air connection (5) to the air hose of the
mortar hose.
• Screw coupling plug (6) for remote control to the control ca-
ble of the mortar hose.
3
5
6
Extension cable PlastCoat 25
The cross section of the cable must be min.
3 x 2.5 mm. Unwind extension cable com-
pletely. Make sure that the couplings and
plugs are in complete working order.
Extension cable PlastCoat 35
The cross section of the cable must be min.
5 x 2.5 mm. Unwind extension cable com-
pletely. Make sure that the couplings and
plugs are in complete working order.
Plast Coat 25 · 35
2
4
1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Plast coat pc 35

Table des Matières