Mettler Toledo IND246 Guide D'installation page 46

Masquer les pouces Voir aussi pour IND246:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 177
7. Install a screw clamp over the flat braid, and tighten it to secure it to the POWERCELL cable.
8. The external installation of the POWERCELL cable is now complete.
2.4.4.4.
Internal Grounding and Connections
1. Inside the terminal enclosure, twist together the black and green wires, and the inner drain wire.
2. Cut the wires twisted in step 1 to a length appropriate to reach one of the grounding studs
3. Terminate the twisted wires with the ring terminal provided.
4. Create a ground wire to connect the grounding stud to the ground connector on the
2-26
METTLER TOLEDO IND246 and IND246 POWERCELL Installation Manual
Figure 2-50: Braided Cable Clamped to POWERCELL Cable
Figure 2-51: Grounding Wires and Inner Drain Wire Twisted Together
inside the enclosure. One grounding stud is already used by the incoming power ground, while
a second stud is free. Note: Do not discard the black wire cut off in this step.
motherboard:
a. Cut the black wire removed in step 2 to 8"/20.5 cm long.
Figure 2-52: Ground Wire Termination
Grounding
feature mounted
to enclosure
Outer drain wire
joining braided cable
at grounding feature
Braided cable
clamped to
POWERCELL
cable
64084463
|
02
|
12/2013

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ind246 powercell

Table des Matières