Commissioning; Recommissioning; Settings; Shutting Down - Stiebel Eltron SHW 200 S Utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 32
INSTALLATION

Commissioning

11. Commissioning
11.1 Commissioning
f Open a draw-off point until the appliance has filled up and
f
the pipework is free of air.
f Adjust the flow rate. For this, observe the maximum permis-
f
sible flow rate with a fully opened tap (see chapter "Specifi-
cation / Data table"). If necessary reduce the flow rate at the
butterfly valve of the safety assembly.
f Carry out a tightness check.
f
f Turn the temperature selector to maximum temperature.
f
f Switch the mains power ON.
f
f Check the function of the appliance.
f
f Check the function of the safety assembly.
f
11.1.1 Appliance handover
f Explain the appliance function to users and familiarise them
f
with its operation.
f Make the user aware of potential dangers, especially the risk
f
of scalding.
f Hand over these instructions.
f

11.2 Recommissioning

See chapter "Commissioning".
www.stiebel-eltron.com

12. Settings

12.2.1 Limiting the temperature selection
You can adjust the temperature selection limitation beneath the
temperature selector.
Factory setting: Limited to 60 °C
f Set the temperature selector to "cold" and isolate the appli-
f
ance from the power supply.
f Remove the temperature selector and the control panel
f
cover.
1
1 Limiter disc
2 Without limiter disc, maximum 82 °C
f You can set the limit to 45 °C / 60 °C by rotating the limiter
f
disc. After removing the limiter disc, the maximum tempera-
ture can be set.
f Replace the control panel cover and temperature selector.
f

13. Shutting down

f Disconnect the appliance from the mains at the MCB/fuse in
f
the fuse box.
f Drain the appliance. See chapter "Maintenance / Draining the
f
appliance".
2
SHW S |
25

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Shw 300 sShw 400 s

Table des Matières