Installing The Solenoid Valve - JUKI LB-6 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 153

2. Installing the solenoid valve

WARNING :
To protect against personal injury due to abrupt start of the machine, conduct maintenance works with
the power turned off.
5
3
4
1
7
5
3
1
3
6
2-pin
connector
2
2-pin
connector
(1) Presser lifter solenoid valve
Attach mounting base 2 to solenoid valve 1 with
1)
screws 5 .
ø6 Attach joint 3 and silencer 4.
2)
(2) Thread tension release solenoid valve
Attach mounting base 6 to solenoid valve 5 with
screws 7.
(3) Intermediate latch drive solenoid valve
Attach mounting base 2 to solenoid valve 1 with
screws 3.
25

Publicité

Table des Matières
loading

Table des Matières