Configure The Grid Profile - Enphase Energy Envoy Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

10. Configure the Grid Profile

The following steps describe how to configure the grid profile. After all of the
microinverters at the site are detected, you can apply the grid profile.
If you need to change the grid profile subsequent to this procedure, follow the steps
in Change the Grid Profile on page 32.
Each Grid Profile contains a set of trip points. Trip points are input voltage or
frequency values that trigger the microinverters to shut down. These trip points vary
from region to region. You will need to set the grid profile.
NOTE: Enphase Microinverters will not begin exporting power until the Envoy
Communications Gateway is installed and has detected all of the microinverters
at the site. In addition, the grid profile must be configured and the Envoy must
have propagated these settings to the microinverters.
a . Open the Internet browser application on a computer that is connected to the
same local network as the Envoy.
b . In the browser address window, enter the IP address displayed in the LCD
screen of the Envoy.
Once the browser has successfully connected with the Envoy, the System Overview
screen is displayed in the browser window.
c . From the Language menu, select your preferred language.
d . Click on Inventory and verify that all installed microinverters are detected.
e . Click Administration to access the Administration menu.
The default log in credentials for the Administration menu are:
Username: admin
Password:
12
admin
Copyright  2011 Enphase Energy
Click here
to select
Language
Click here to
access the
Administratio
n menu.
141-00014 Rev 02

Publicité

Table des Matières
loading

Table des Matières