Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

ATTENTION:
DANGER:

4.3 Installation

DANGER:
To conduct the task in question, the following Individual Protection Devices are necessary:
The Blocksystem P – SV must be installed in locations where good recycling and exchange of air is guaranteed and must only be
installed on vertical walls. The Blocksystem SF must be installed in locations where good recycling and exchange of air is
guaranteed and must only be installed on horizontal walls (ceiling). For other installations, we recommend you contact the
manufacturer. For positioning of a mono-condensing unit and the evaporator, comply with the minimum heights reported in
Figure 3
During installation, leave the machine sufficient space to conduct maintenance in safe conditions.
For correct functioning of the machine, we recommend the following minimum thicknesses of the coldroom walls (polyurethane
insulation): MBP and HBP coldroom insulation thickness 60 mm; LBP coldroom insulation thickness 100 mm.
4.3.1. SF Series Installation Method
To proceed to installation of the machine, implement the following procedure:
1.
On the ceiling of the coldroom, based on the model, make a hole of suitable dimensions as indicated in the pages from
Figure 13 to Figure 17 of Chapter 9 at the end of the handbook.
2.
Position the anti-condensate slab supplied along the perimeter of the hole.
3.
Lift the machine with the hoist or another suitable vehicle in compliance with the lifting instructions in Figure 2.
Position the machine in the hole made in the ceiling of the coldroom and place the evaporating part in from outside.
1.
5.
Fasten the machine to the ceiling of the coldroom with self-threading screws using the two brackets and the screws supplied
(Figure 4).
6.
Seal the perimeter of the aluminium conveyor with silicon (suitable for use in the coldroom) to avoid infiltration of warm air
inside the coldroom.
during all these operations follow the precautions necessary to avoid knocking and tipping over,
moving the machine in a manner not to loose balance.
ensure there are no unauthorised staff near the zone where the lifting, movement and unloading
operations take place and always keep a safe distance.
the manufacturer declines all responsibility for any damage to property and/or persons deriving from
improper interventions conducted by unqualified, untrained or unauthorised staff.
Figure 3 – Minimum compliance heights.
Figure 4 – Machine positioning in coldroom.
set
off
on
UK
P-SF-SV Pag. 47 REV 00 02/11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

SfSv

Table des Matières