4.5.3 Procedure
•
Determine the location where you wish to install the acid pump on the wall.
•
Check that the all components: electrical wiring, tubes etc. reach their position.
•
Drill, and fasten the pump mounting bracket to the wall and hang the pump on it.
•
Open the control box service panel.
•
Find the acid pump connection point marked "acid pump". Insert the signal cable that originates from the
pump through the hole at the bottom of the control box and connect it to the acid pump terminal. Make sure
the cable is secured and put the panel cover back in position.
•
Connect the electrical cable of the acid pump to the main power source in the machine room (240V) parallel
to the circulation pump. This must be performed by a licensed electrician!
•
Establish the pipe diameter you have installed and make sure you have the correct pipe saddle (50 or
63mm).
•
The saddle clamp for the acid pump must be installed on the pipe right after the electrolysis cell.
•
Select the point where the acid will be injected, and drill a 9mm hole in the pipe.
•
Turn the top part of the saddle clamp over and make sure the o-ring is in position. Place the 2 sections of
the clamp over the hole you just drilled.
Insert the two screws through the saddle clamp holes and tighten them using a13 mm wrench.
50/80
2021/02 - Indice de révision : E - Code : 29650
TRAITEMENT DE L'EAU