USE
7. Daily Switch-On
"Before switching on the machine, ensure the
following:
The mains switch is on.
The water mains tap is open".
Electric switching on
Turn the main switch (1) to position 1.
The boiler is filled until the set level is reached.
Turn the main ON/OFF switch (1) to position 2.
"Heating" now begins.
At the end of the day, turn the machine OFF by turning the
main ON/OFF switch (1) to position 0.
8. Heating phase
CAUTION: do not put any cloth on the cup-
warmer.
While awaiting for the machine to be ready for use, insert the
filter baskets (10) in the groups.
Do not cover the cup warmer with cloths to prevent over-
heating of the machine.
When the pressure gauge (14) indicates normal working
pressure, the machine is ready to be used.
9. Delivery of the coffee
1. Unhook the filter-holder (10) from the group.
2. Place the grounds in the grounds drawer.
3. Fill the filter with a dose of ground coffee.
4. Level out with the coffee press.
5. Insert the filter-holder (10) into the group ensuring it that
the gasket provides a good seal.
6. Place the cups (or cup) under the dispensing spouts.
7. Press the coffee distribution key (2, 3, 11 or 12) corre-
sponding to the desired dose. The corresponding led lights
up, the coffee will be issued and will stop automatically
upon completion.
Press the continuous/STOP distri-
bution button (4) for a continuous distribution.
The distribution, both dosed and continuous, may be
interrupted at any time by pressing the continuous/STOP
key (4).
1
2
10
26
14
3
4
11
12