7. Operation
Setting the tolerance plate
· Pull out latch bolts and move tolerance plate to the required
measurement points.
Repeat process on opposite side.
Fig. 10: Setting the tolerance plate
Note
i
The positions of the tolerance plates as well
as the number of tolerance plates must be
matched to the depth of the drawer that is being
assembled.
Fig. 11: Position of tolerance plate/stop
Note
i
The values on the "tolerance bar" scale and the
"drawer depth stop" scale must agree
88
Setting drawer side profile height
· Pull out latch bolts and move stop to the required drawer
side profile height.
Repeat process on opposite side.
Fig. 12: Setting rear panel heights
Setting rear panel heights
· Pull out latch bolts and move stop to the required rear panel
height.
Repeat process on opposite side.
Fig. 13: Setting drawer side profile height
7. Operation
Insert drawer bottom panel and push forward as far as the stop.
Position drawer side profiles (left and right) against the sides of
the bottom panel and push them as far as the drawer side profile
stop.
ArciTech:
Locate drawer rear panel and, using both hands, firmly press into
the springs so that it clicks into place.
InnoTech:
Locate drawer rear panel and, using both hands, press into the
adapter hooks from the side or from above so that it clicks into
place.
Push drawer side profiles forwards (together with drawer rear
panel) against the fixed stop.
Actuate the two hand switch system and the drawer components
will be joined together.
Once the parts have been joined together, remove the drawer
from the assembly jig.
7.5 Switching the machine off
The machine is switched off in the opposite sequence of swit-
ching it on:
· Remove the assembled drawer.
· Disconnect the machine from the energy supply
(pneumatic system).
The machine is now switched off.
89