4 Installing the inverter
4.4
Minimum clearances
B
A
200 mm
B
60 mm
24
B
Minimum clearance
B + 95
4.5
Requirements for the installation site
▶
Ensure that the minimum clearances (→ Page 24) are
complied with.
▶
Ensure that the direct current cabling can be routed from
the photovoltaic modules to the inverter.
▶
Ensure that the alternating current cabling can be routed
to the meter cabinet.
▶
Ensure that the installation site is fixed, vertical and level.
▶
Ensure that the immediate surroundings of the installa-
tion are difficult to ignite.
▶
Ensure that the installation site is free from continuous
vibrations.
▶
Ensure that the installation site is located in an air-condi-
tioned or non-air-conditioned interior room.
▶
Ensure that the installation site complies with the re-
quirements of climate class 3K3 in accordance with
IEC 60721-3-3.
▶
To use the web portal, ensure that an Internet router is
available.
▶
If required, ensure that the data connections for con-
necting other approved products can be routed to the
inverter.
Installation and maintenance instructions VPV I 0020273404_00
B + 95