Preparation for Installation
The pump is supplied in a special protective packing. If this shows
signs of damage which may have occurred during transport, contact
your local sales office.
When unpacking the pump, be sure not to drop it and avoid any kind
of sudden impact or shock vibration to it.
Do not dispose of the packing materials in an unauthorized manner.
The material is 100 % recyclable and complies with
EEC Directive 85/399.
In order to prevent outgassing problems, do not use bare hands to handle
CAUTION!
components which will be exposed to vacuum. Always use gloves or other
appropriate protection.
Normal exposure to the environment cannot damage the pump. Nevertheless, it
NOTE
is advisable to keep it closed until it is installed in the system, thus preventing
any form of pollution by dust.
2 l/s Ion Pump User Manual / 87-900-091-01 (E)
Instructions for Use
Preparation for Installation
4
39/68