6 Initial Setup and Start
also monitors the grid parameters. If the grid
parameters are within the specifications during the
required period (depending on the grid code), the
inverter starts feeding into the utility grid.
On grid (green LED glowing)
#60
The inverter is connected to the utility grid and feeds
into the grid. The inverter disconnects from the utility
grid in the following cases:
• The inverter recognizes abnormal grid conditions
(depending on the grid code).
• An internal event occurs.
• PV power is insufficient (no electric current has
been fed in for approx. ten minutes).
Internal inverter event (green LED flashing)
#54
The inverter waits for an internal state within the
thresholds (e.g. due to too high a temperature)
before reconnecting to the utility grid.
Fail safe (red LED flashing)
#70
If the inverter detects an error in its circuits during the
self-test (in the "Connecting" operating mode) or
during operation, it switches over to the "Fail safe"
operating mode and is disconnected from the utility
grid. The inverter remains in the "Fail safe" operating
mode until the PV power has been absent for ten
minutes or the inverter has been shut down
completely (AC+PV).
6.1.2 Display
INFORMATION
It may take some time until the display responds
after switching on.
The integrated display gives the user access to
information about the PV system and the inverter.
34
SHP75-10-STP60-10-IA-xx-20
Figure 32: Overview of display buttons and functionality
Display buttons and functionality
Button
F1
F2
F3
F4
Home
OK
Up arrow
Down arrow
Arrow right
Arrow left
Back
On – green LED
Alarm – red LED
The screen design is divided into different sections:
SMA Solar Technology AG
Function
Adjust the contrast level of
display. Use arrow up/down
button while pressing the F1
button.
No function
Return to main screen
No function
A step up
A step down
Toggles screen right
Toggles screen left
Return to main screen