SMA SUNNY HIGHPOWER PEAK1 Instructions D'installation page 41

Masquer les pouces Voir aussi pour SUNNY HIGHPOWER PEAK1:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

SMA Solar Technology AG
System-Related Events
ID
Status
message
2000
2010,
2011
2012 -
2018
2030
2050
2051
2052,
2053
2054
2055
Fallback
activated
2056
Fallback
completed
Installation Guide
Description
Communication assembly is
booting.
The software update of the
main CPU has started / has
finished.
The software update failed. Restart the software update. If
Transmission of the grid
code to the main computer
failed.
Ethernet connection is
active
Ethernet connection is
disconnected
Transmission of the Grid
Code from the SMA
Inverter Manager to the
inverter has started/ended.
Transmission of the Grid
Code from the SMA
Inverter Manager to the
inverter has failed.
The inverter switched to the
fallback mode after the
communication with the
SMA Inverter Manager
was interrupted.
The inverter has switched
back to normal operation
after having been in the
fallback mode due to a
communication disturbance
with the SMA Inverter
Manager.
Measures
-
-
an error occurs during the
update, contact Service.
If this event occurs frequently,
contact Service.
No measure necessary. This
error is used, for example, to
identify bad Ethernet cables.
No measure necessary. This
error is used, for example, to
identify bad Ethernet cables.
-
If this event occurs frequently,
contact Service.
SHP75-10-STP60-10-IA-xx-20
8 Service
DN
SMA S
PV
O
ervice
Line
-
-
-
-
-
-
-
x
-
-
x
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
41

Publicité

Table des Matières

Dépannage

loading

Ce manuel est également adapté pour:

Sunny tripower 60

Table des Matières