Close - SMA SUNNY HIGHPOWER PEAK1 Instructions D'installation

Masquer les pouces Voir aussi pour SUNNY HIGHPOWER PEAK1:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5 Installation
Figure 29: Do not connect PV to ground
Figure 30: DC connection area
INFORMATION
Cables with multi-strand, fine-strand or extra
fine-strand conductors can be used for DC
connection. The cables must be suitable for a
temperature of at least 75°C.
When using fine-strand or extra fine-strand
conductors, bootlace ferrules must be used for
the connection.
32
SHP75-10-STP60-10-IA-xx-20
Figure 31: Cables with different conductors (from top to
bottom): multi-strand, fine-strand and extra
fine-strand
1. Switch the DC load-break switch on the inverter
to "Off" and, if available, also on the PV array
junction box.
2. Connect the PV cables from the PV array junction
box to the inverter. When doing so, ensure the
correct polarity.
3. All conductors must be properly attached with
the correct tool (screwdriver bit, length min. 50
mm) and correct torque, see Section 9.4,
page 49.

5.12 Close

Closing the inverter with one-piece enclosure
lid:
1. Insert the intermediate frame into the inverter and
tighten the eight fastening screws (TX25, torque:
6 Nm).
SMA Solar Technology AG
Installation Guide

Publicité

Table des Matières

Dépannage

loading

Ce manuel est également adapté pour:

Sunny tripower 60

Table des Matières