Connecting (green LED flashing)
#52-53
Once the PV input voltage reaches the DC initial voltage,
the inverter goes into operation.
The inverter performs a series of internal self-tests, including
measurement of the resistance between the PV array and
ground. Meanwhile, it also monitors the grid parameters. If
the grid parameters are within the specifications during the
required period (depending on the grid code), the inverter
starts feeding into the utility grid.
On grid (green LED glowing)
#60
The inverter is connected to the AC grid and feeds into the
grid. The inverter disconnects from the utility grid in the
following cases:
• The inverter recognizes abnormal grid conditions
(depending on the grid code).
• An internal event occurs.
• PV power is insufficient (no electric current has been
fed in for approx. ten minutes).
Internal inverter event (green LED flashing)
#54
The inverter waits for an internal state within the thresholds
(e.g. due to too high a temperature) before reconnecting to
the utility grid.
Fail safe (red LED flashing)
#70
If the inverter detects an error in its circuits during the self-test
(in the "Connecting" operating mode) or during operation,
it switches over to the "Fail safe" operating mode and is
disconnected from the utility grid. The inverter remains in the
"Fail safe" operating mode until the PV power has been
absent for ten minutes or the inverter has been shut down
completely (AC+PV).
Installation Guide

3.2 Display

INFORMATION
It may take some time until the display responds after
switching on.
The integrated display on the inverter front gives the user
access to information about the PV system and the inverter.
Figure 3.1 Overview of display buttons and functionality
Display buttons and functionality
Button
Function
F1
Adjust the contrast level of display. Use
arrow up/down button while pressing
the F1 button.
F2
No function
F3
F4
Home
Return to main screen
OK
No function
Up arrow
A step up
Down arrow
A step down
Arrow right
Toggles screen right
Arrow left
Toggles screen left
Back
Return to main screen
SHP75-10-STP60-10-IA-xx-18
3 Initial Setup and Start
31