Télécharger Imprimer la page

Stihl RMI 522 C Manuel D'utilisation page 155

Publicité

In corridors, the lawn is only mown
along the path of the perimeter
wire. If necessary, activate
automatic edge mowing or mow the
corridor area manually on a regular
basis. (
11.13)
If corridors are to be installed,
switch off offset drive home
(passage) (
11.13) or install guide
loops. (
12.12)
The specified wire clearances and
the corridor template are adapted to
the routing of the perimeter wire on
the lawn area. The dimensions will
deviate if the perimeter wire is
routed very deeply, e.g. under
stone paving. Check the function
and adapt the wire routing if
necessary.
Requirements:
– Minimum width is 88 cm between solid
obstacles in the corridor area and
22 cm between paths that can be
travelled on.
In longer corridors, a slightly
increased space requirement
should be taken into account
depending on the ground
conditions. Longer corridors should
always be installed as centrally as
possible between obstacles.
– The corridor can be travelled on freely.
– At least 1 starting point must be
defined in the area of the second
mowing area. (
11.14)
0478 131 9965 D - EN
The docking station (1) is installed in
mowing area A. Mowing area B is linked
to mowing area A by means of a
corridor (2). The perimeter wire (3) can be
continuously followed by the robotic
mower. In order to mow mowing area B,
starting points (4) must be defined.
(
11.14)
Individual mowing operations can then be
started at the starting points, depending on
the setting (starting frequency).
Installing the start and end of the
corridor:
The perimeter wire (1) must be routed in a
funnel shape as illustrated at the start and
end of a corridor. This prevents the robotic
mower from accidentally driving into the
corridor during mowing.
The dimensions are very much
dependent on the environment and
the terrain. For corridors with a
funnel-shaped start or end, always
check whether the robotic mower
can pass through it.
Route the perimeter wire roughly
one device length to the left and
right of the corridor entrance.
153

Publicité

loading