Note
The ends of the frame poles (1) must be completely inside the connector (1a).
5. Connect one bracket pole (2) and two extension poles (5) to create one foot; repeat until you have made four
feet.
Note
They must CLICK audibly when being fastened. The pin of the bracket pole (2) is then correctly locked into the pin
hole of the extension pole (5).
6. Insert the ends of the four feet into the leg sleeves of the frame poles (1).
7. 2 Installing the jump mat
The jump mat (6) is pulled taut with 56 springs (12). The order of insertion is important for ensuring even distribution
of forces. Following the proper order makes assembly easier and safer. Proceed as follows:
1. Spread out the jump mat (6) inside the circle of the base frame. Make sure that the marking on the jump mat (6)
is facing upwards.
WARNING!
Be careful when inserting the springs (12)! The springs (12) are under tension during insertion! There is a risk of
injury!
WARNING!
Take care when inserting the springs (12) and follow the instructions below precisely so that the jump mat (6) is set
up properly. Otherwise there is a risk of injury!
Note
The jump mat (6) has 56 eyelets (6a), and there are 56 openings around the top of the base frame.
2. Select any point as point 0 for inserting the first spring (12).
3. Hook the almost-closed end of the spring (12) into an eyelet (6a) of the jump mat (6).
WARNING!
Always use the spring pull T-hook (11) when attaching the springs (12).
Make sure that the springs (12) fully lock into the openings in the base frame. Otherwise there is a risk of injury!
Note
The springs (12) are different at each end. The almost-closed end is hooked into an eyelet (6a) of the jump mat (6).
The open end is hooked into an opening in the base frame.
4. Pull firmly and hook the open end of the spring (12) into an opening in the base frame.
5. Count 14 eyelets (6a) further and insert the second spring (12) into the 14th eyelet (6a) and opening.
6. Count another 14 eyelets (6a) further and insert the third spring (12) into the 28th eyelet (6a) and opening
(counting from point 0).
7. Count another 14 eyelets (6a) further and insert the fourth spring (12) into the 42nd eyelet (6a) and opening
(counting from point 0).
34
GB/IE