Télécharger Imprimer la page

Napoleon Riverside Serie Manuel D'installation Et D'utilisation page 8

Masquer les pouces Voir aussi pour Riverside Serie:

Publicité

Les langues disponibles

Les langues disponibles

general information
EN
1.3
rates and efficiencies
For your satisfaction, this appliance has been test-fired to assure its operation and quality.
Altitude (FT)
Max. Input (BTU/HR)
Min. Inlet Gas Supply Pressure
Max. Inlet Gas Supply Pressure
Manifold Pressure (Under Flow Conditions)
1.4
installation overview
8
1. Determine the final location of the appliance (see "location" section).
2. Determine the most appropriate gas inlet location (see "gas inlet location" section).
3. Plan out appliance enclosure, framing, fronts, accessories, etc.
4. Install all electrical wirings (refer to "electrical information" section).
5. Install gas lines (see "gas installation" section).
6. Test appliance.
7. Install nailing tabs (see "nailing tab installation" section).
8. Complete finishing (see "finishing" section).
8
W415-10001315 / D-0 / 07.10.24
Natural Gas
4.5" (11mb) w.c. 11" (27mb) w.c.
3.5" (9mb) w.c.
2
3
5
4
RSS36
Propane
Natural Gas
0-4,500
50,000
4.5" (11mb) w.c.
13" (32mb) w.c.
10" (25mb) w.c.
3.5" (9mb) w.c.
6
7
RSS42
Propane
60, 000
11" (27mb) w.c
10" (25mb) w.c.
1

Publicité

loading

Ce manuel est également adapté pour:

Rss36neRss42neRss36peRss42pe