NOTE: Boundary wire front of the charging station should be straight for 1m
without corners or obstacles to ensure proper docking.
It is recommended to place the charging station in a good Wi-Fi signal location,
so that the Super-Link can work properly.
The charging station must be positioned on relatively level ground. it must
not be positioned on an inclined surface or anywhere that makes its plate
bend.
1.2 We recommended the Power supply placed the wall at least 30cm height,
and the power supply cord is outside the mower working area.If not, you
may bury it if desired.
1.3 Stripping boundary wire about 10mm one end.
1.4 Boundary wire insert the wire terminal(RED color in red)----it's an OUT
side, then the boundary wire through the slot under the charging station
plate.
1.5 When you laying boundary wire the working area loop, cut off
unnecessary wire, Stripping boundary wire about 10mm the other end,
insert the other wire terminal(Black)---it's an IN side.
2. Installation of Boundary wire (NOTE)
2.1 When laying the boundary wire, use the distance gauge to keep a 30cm*
space between the wire and perimeter, Each wire peg should be placed
around 80cm apart, use the provided distance gauge to ensure proper
installation. The ground is uneven area, the peg density can be increased
appropriately.
NOTE: The maximum permitted length for the boundary wire is 300m.
Original instructions
19