Télécharger Imprimer la page

CAME G6501 Manuel D'installation page 36

Publicité

Les langues disponibles

Les langues disponibles

Preparing the anchoring base
The following illustrations are just examples, in that the space for securing the operator and accessories depends on the overall
measurements. It is up to the installer to choose the most suited solution.
Dig a pit for the achoring base, set up the needed corrugated tubes for connections coming from the junction pit.
N.B. the number of tubes depends on the type of installation and accessories used.
Assmble the four clamps to the anchoring base.
Fill the pit with cement, submerge the base making sure that the corrugated tubes pass through the hole on the base. The base must be
perfectly level, clean and with the bolt threading completely on the surface.
M12x40 UNI
5739 screw
Wait at least 24 hrs for everything to solidify. Remove the nuts and washers from the threaded bolts.
M12 UNI5588 nut
Washer
24h

Publicité

loading

Ce manuel est également adapté pour:

G6500