Hygienic Weighing Module Contego®
2.3.2
Jack-up
2.3.3
Adjusting the Internal Lift-Off Protector
EN-6
Procedure
•
Release the locknut (2).
•
Turn up the screw (1) at the hex to lift the vessel.
Caution: Don't lift the vessel by more than
6 mm!
Turn the bolt until the load cell is unloaded and
can be removed together with the upper thrust
piece.
•
Insert the upper thrust piece into the new load
cell.
•
Insert the load cell into the mounting kit, push
the load cell cable through the cable gland and
block it; refer to Chapter 8.1.2.
•
Adjust the internal lift-off protector; refer to
Chapter 2.3.3.
Procedure
•
Release the locknut (2).
•
Turn the bolt (1) of the lift-off protector at the
hex (3) fully down to the stop.
•
Turn the bolt back by 1...1½ revolutions
(approx. 2 mm) to adjust the spacing.
•
Re-tighten the locknut (2).
Installation Manual
Sartorius