WARNING!
Pressurised system!
Interventions in the pneumatic system represent an acute risk of injury.
Work on the pneumatic system may only be carried out by qualified and
instructed personnel using appropriate tools.
First switch off pressure before disconnecting lines and valves.
Observe the flow direction during installation!
Observe the applicable accident prevention and safety regulations for
pneumatic systems!

4.1. Montage

NOTES!
Installation in any position.
Preferably with solenoid system mounted at the top
Activity
Clean the pipe runs
Installation in any position
Connect a dirt-trap
(strainer) upstream
Seal
Screwing on the pipe run
Installation / Dismounting
Make electrical connections

4.2. Commissioning

Before commissioning, ensure that
The device has been correctly installed,
The connections have been correctly made,
The device is not damaged,
All bolts are securely tightened.
Notes
Preferred direction with drive mounted at the
top
Note the direction of flow!
PTFE
Note the direction of flow!
Note
Always connect the earth conductor!
Note for units with connecting cable
The connecting cable and the coil are moduled
together. They must not be dismantled!
03 ATEX1089 X - 15