Assembling The Main Cabinet To The Cabinet Base; Installing The Cooking Components; Mounting The Logo Plate; Mounting The Cabinet Door Handle, Door Latch - Pit Boss 2 Serie Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

10. ASSEMBLING THE MAIN CABINET TO THE CABINET BASE

Parts Required:
1
x
Grill Probe Bracket (#18)
6
x
#10–24x½" Screw (#C)
#5–32x½" Screw (#G)
2
x
Installation:
Prepare the main cabinet to be mounted to the cabinet base. Position
the cabinet base next to the main cabinet, with both facing the same
direction. Lock the caster wheels on the cabinet base. Carefully, lift
the main cabinet onto the cabinet base. Secure the main cabinet to the
cabinet base using six screws (#C). Note illustration 10A.
At the rear wall, along the bottom edge of the main cabinet, locate
the Grill Probe. Secure the Grill Probe into place with the Grill Probe
bracket using two screws (#G). Note 10B.
IMPORTANT: Once the Grill Probe bracket is secure, ensure the
stainless steel tip extends above the lip of the lower cabinet. This
reads the internal temperature of the main cabinet. Incorrect
placement of the Grill Probe may result in wrong temperature
readings on the Control Board.

11. INSTALLING THE COOKING COMPONENTS

Parts Required:
6
x
Cooking Grid Support Brackets (#2)
3
x
Cooking Grids (#1)
1
x
Water Pan (#13)
1
x
Water Pan Support (#14)
Installation:
Insert the water pan support into the bottom of the main interior
cabinet, then sit the water pan in the support. Note 11A.
NOTE: Keep water in the water pan at all times while cooking. It will
catch grease and drippings from your cooks and allow for easier
clean up. If smoking for an extended period, move water pan up
higher to allow water to last longer.
Next, insert six cooking grid support brackets into the holes along
the inside walls of the interior main cabinet. Once positioned in the
holes, tilt downward to secure into position. Repeat the same process,
matching the same heights, for the right-side wall. Note 11B.
Lastly, place the cooking grids on the grid support brackets inside the
main cabinet. Note 11C.
CAUTION: To change the height between each cooking grid, adjust
only when the smoker is completely cooled to avoid injury.

12. MOUNTING THE LOGO PLATE

Parts Required:
Logo Plate (#5)
1
x
1
x
Cabinet Door (#8)
10
10A
10B
18
11
1
2
1
11C
11B
1
13
14
11A
Installation:
Remove the washer and wing nut from the packaged logo plate.
Insert the logo plate into the mounting hole on the front of the
cabinet door, place the washer on the thread pole on the inside of the
door, and hand-tighten by hand to secure.
NOTE: The logo plate is supplied with one washer and one wing nut.
13. ATTACHING THE GREASE SHIELD
Parts Required:
Door Grease Shield (#12)
1
x
5
x
#8–32" Screw (#F)
Installation:
Attach the door grease shield to the bottom lip of the cabinet door using
five screws. Take care not to over-tighten to avoid stripping the screws.
NOTE: The holes for the screws need to be self-tapped, as they are
not pre-threaded. If needed, carefully use a drill to start, then finish
tightening with screwdriver by hand.

14. MOUNTING THE CABINET DOOR HANDLE, DOOR LATCH

Parts Required:
Cabinet Door Handle (#6)
1
x
1
x
Cabinet Door Latch (#7)
4
x
#10–24x½" Screw (#C)
Installation:
First, re-mount the cabinet door to the main cabinet by aligning and
securing both hinges. Ensure the door is mounted correctly by testing
it opens freely. Note 14A.
Mount the cabinet door handle onto the front side of the cabinet door
using two screws. Note correct direction in 14B.
Mount the cabinet door latch onto the exterior side of the main
cabinet using two screws. Note 14C.
15. ASSEMBLING & INSTALLING THE WOOD CHIP TRAY
Parts Required:
1
x
Wood Chip Tray Lid (#10)
1
x
Wood Chip Tray Assembly (#11)
2
x
#10–24x½" Screw (#C)
Installation:
First, assemble the wood chip tray assembly by securing the faceplate
and handle using two screws. Next, insert the wood chip tray lid into
the lid slots on the wood chip tray assembly and flip the lid down so it
closes. Note illustrations in 15A.
Slide the assembled wood chip tray into the opening above the control
board on the front panel of the unit. Note 15B.
12
5
13
12
14
7
14A
14C
6
14B
15A
10
11
15B
11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pbv2d110949

Table des Matières