INsTALLATIoN
Commissioning
f Screw the wall mounting frame to the wall mount casing.
1 Internal sound insulation panel
2 Wall mounting frame
f Tilt the internal sound insulation panel at the top towards the
wall.
f Hook the internal sound insulation panel onto the wall
mounting frame. The two bolts on the internal sound insula-
tion panel must go down into the holes provided in the wall
mounting frame.
1 Spring button
f Bring the internal sound insulation panel bottom towards the
wall mounting frame. Then push and hold the spring button
underneath the internal sound insulation panel lightly.
www.stiebel-eltron.com
The internal sound insulation panel clicks home into the wall
mounting frame.
6.
6.1
6.1.1 Checks before commissioning
All electrical cables must be installed correctly by a qualified con-
tractor.
The fan must be able to rotate freely. There should not be any
obstructions in the area of the fan.
6.1.2 Opening the internal panel
Standard internal panel
2
1
f Carefully pull the internal panel cover slightly back from the
Internal sound insulation panel
f Move the flap on top of the internal sound insulation panel
1
f Lower the flap into the internal panel.
Note
Only open the internal panel just before commissioning.
Commissioning
Initial start-up
wall.
upwards by 90°.
1.
2.
LWE 40 |
35