INsTALLATIoN
preparation
4.3
Wall construction
The space between the wall and the wall mount casing must be
sealed on the inside and outside so that it is airtight.
Solid masonry with composite thermal insulation (plan view)
1
2
175-240
~10
1 Exterior render
2 Composite thermal insulation
3 Stone
4 Interior plaster
5 2-component PUR foam
Masonry with timber frame construction (plan view)
1
2
3
40-60
180-240
1 Soft fibreboard
2 Load bearing element
3 Timber frame construction with insulation in between
4 OSB board
5 Installation level (wooden structure with insulation in
between)
6 Plasterboard
7 Wooden edging
8 2-component PUR foam
24
| LWE 40
3
4
120-160
~10
5
4
5
60-80
6
18-28
11,5
7
8
185 x 185
Masonry with clinker construction (plan view)
1
2
115
80-120
30-50
1 Clinker brick
2 Air gap
3 Composite thermal insulation
4 Stone
5 Interior plaster
6 2-component PUR foam
4.4
Wall outlet
The figures show the wall without plaster.
4.4.1 Solid wall
f Create a wall outlet vertical to the wall without a fall.
3
4
175-240
~10
5
6
www.stiebel-eltron.com