INsTALLATIoN
Installation
Power supply unit for more than 2 appliances
The control unit and the programming unit are installed in a flush
box. The power supply unit is installed on a top-hat rail in the fuse
box. The power supply unit and the terminal blocks each require
4 MCB spaces.
f Install the power supply unit on a top-hat rail in the control
panel distribution board.
f Safeguard the power supply unit with a separate circuit
breaker.
f Mount the flush box for installing the control unit and pro-
gramming unit. The flush box must be vertical and flush with
the interior plaster.
f Install the cable from the control panel to the control unit.
Cable type : YR 4 x 0.8 mm²
Cable length : ≤ 25 m
f Push the cable routed to the control panel into the flush box
from above. The cable must protrude 200 mm into the flush
box.
f Push the cable routed to the ventilation unit into the flush
box from above. The cable must protrude 200 mm into the
flush box.
5.
Installation
5.1
Wall mount casing
26
| LWE 40
f Measure the wall thickness, including thermal insulation and
plaster.
The marked measuring scale helps you to adjust the wall mount
casing to the wall thickness.
Note
The corners of the wall mount casing must finish flush
with the wall.
f Slide the two parts of the wall mount casing into each other
or pull them apart.
f To secure the halves of the wall mount casing in position and
seal the overlap, wind suitable adhesive tape around the
joint. The adhesive tape must be airtight and must stick to
plastic. The adhesive tape must be designed for the tempera-
tures expected at the installation site.
Material losses
The joint between the two halves of the wall mount casing
must not be facing down. Otherwise, condensate from the
wall mount casing may penetrate the wall.
Push the wall mount casing into the wall so that the
marked measuring scale is at the top.
f Push the wall mount casing a little way into the wall.