Electrical Fixed Connection
Connecting
DE
EN
FR
IT
ES
PT
NL
SV
FI
DA
NO
EL
Fig. 12: Connections for fixed connection box (3-phase)
CZ
Observe the specified sequence when connecting
HU
the control unit connecting cable B to the
connections for the fixed connection A.
PL
For connecting the wires, use a slotted screwdriver
HR
with a blade width suitable for the connection
screws.
SR
1. Open the cover on the fixed connection box.
SK
2. Connect ground lead PE to the connection PE
of the fixed connection. Tightening torque: 3 Nm
SL
(2 ftlb.)
ET
3. Connect neutral lead N to the connection N
of the fixed connection. Tightening torque: 3 Nm
LT
(2 ftlb.)
4. Connect live lead L1 to the connection L1
LV
of the fixed connection. Tightening torque: 3 Nm
RO
(2 ftlb.)
5. Connect live lead L2 to the connection L2 of
BG
the fixed connection. Tightening torque: 3 Nm
MK
(2 ftlb.)
22
6. Connect live lead L3 to the connection L3 of
the fixed connection. Tightening torque: 3 Nm
(2 ftlb.)
7. Ensure that the wires are correctly connected.
Check that the wires are fitted securely.
8. Switch on supply voltage.
9. Check correct electrical connection using
a voltage tester.
10. Engage the top locking ring on the basic wall
mount by turning it to the left.
Fig. 13: Fixed connection box with cover
11. Close off fixed connection box A using cover B to
prevent improper operation.
Initial operation
Fig. 14: Control unit
A
Power button
B
Status LEDs
C
Display
e Switch on the charger by pressing the Power
button A.
The status LEDs B show the status of the charger.
Communication with the charger is shown on
the display C in the form of information and error
messages.
f See Operating Manual for the Porsche charger.