Connecting
Fig. 9: Connections for fixed connection box (single-phase)
Observe the specified sequence when connecting
the control unit connecting cable B to the
connections for the fixed connection A.
For connecting the wires, use a slotted screwdriver
with a blade width suitable for the connection
screws.
1. Open the cover on the fixed connection box.
2. Connect ground lead PE to the connection PE
of the fixed connection. Tightening torque: 3 Nm
(2 ftlb.)
3. Connect neutral lead N to the connection N
of the fixed connection. Tightening torque: 3 Nm
(2 ftlb.)
4. Connect live lead L1 to the connection L1
of the fixed connection. Tightening torque: 3 Nm
(2 ftlb.)
5. Ensure that the wires are correctly connected.
Check that the wires are fitted securely.
6. Switch on supply voltage.
7. Check correct electrical connection using a
voltage tester.
8. Engage the top locking ring on the basic wall
mount by turning it to the left.
Fig. 10: Fixed connection box with cover
9. Close off fixed connection box A using cover B to
prevent improper operation.
Electrical fixed connection to
building installation (3-phase)
Information
The fixed connection box is not supplied. A fixed
connection box is required for proper installation and
connection of the connecting cable.
For details of items supplied:
f See Operating Manual for the Porsche charger.
Electrical Fixed Connection
Overview
Fig. 11: Connections for fixed connection and control unit
(3-phase)
A
Fixed connection box
B
Control unit
Connection table for fixed connection
Designation
Wire colour
Live lead
Brown
Live lead
Black
Live lead
Grey
Ground lead
Green/yellow PE
Neutral lead
Blue
DE
EN
FR
IT
ES
PT
NL
SV
FI
DA
NO
EL
CZ
HU
PL
HR
International
SR
connection
SK
designation
L1
SL
L2
ET
L3
LT
LV
N
RO
BG
MK
21