Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION INSTRUCTIONS

Building in

Check that the cabinet and the cut-out meet the dimension and
ventilation requirements
Treat the sawn ends of wooden or synthetic worktops with sealing
varnish if necessary, to prevent moisture causing the worktop to swell.
Lay the hob upside down on the worktop.
Remove the protective layer from the sealing tape and apply the tape in
the groove of the aluminium profile or on the edge of the glass plate. Do
not stick tape round the corners, but cut 4 separate pieces to seal the
corners well.
Turn the hob over and lay it in the recess.
Connect the appliance to the mains. A short bleep will be heard and all
the displays will light up briefly. The appliance is ready for use.
Check that it works properly. If the appliance has been wrongly
connected either a bleep will sound or nothing will appear in the
displays, depending on the error.
If the connecting cable is damaged, it may only be replaced by the
manufacturer, the manufacturer's service organisation or equivalently
qualified persons, in order to avoid dangerous situations.
EN 28

Publicité

Table des Matières

Dépannage

loading

Table des Matières