ASSEMBLY INSTRUCTIONS
36. Hang thecurtain (P) to the netting tube
of front beams (B3/B4) and side
beams (D1/D2/D3/D4).
37. Hang the netting (O) to the netting tube
of front beams (B3/B4) and side beams
(D1/D2/D3/D4).
38. Secure the netting (O) to the posts
(A1/A2/A3/A4) using the loop and hook.
23