Manitowoc QF0400 Manuel D'installation, D'utilisation Et D'entretien page 15

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Section 4
Inner Panel & Ice Diverter Removal
1. Place the toggle switch in the OFF position, turn off
the water supply and disconnect electrical power to
the ice machine.
2. Open bin door to access panel and diverter.
3. Remove thumbscrews and lift inner panel forward.
4. Remove bin level sensor from white plastic inner
panel.
5. Remove ice diverter from bin.
6. Remove white plastic inner panel from bin.
7. When the bin level sensor is reinstalled the correct
position is 4.5" (11.4 cm) from the left edge of the
white panel.
Cabinet Removal
1. Remove all ice from bin and disconnect power and
water supplies.
2. Remove thumbscrews and evaporator panel.
3. Remove three screws from the bottom of the left and
right side of cabinet.
4. Remove screws from back panel.
5. Disconnect drain line clamp.
6. Slide cabinet forward and remove from base.
Remove 3
Screws From
Each Side
Part Number 000007651 05/10
Water Level Probe Removal
1. Place the toggle switch in the OFF position, turn off
the water supply and disconnect electrical power to
the ice machine.
2. Disconnect water supply line at float valve quick
disconnect by depressing stainless steel lever.
3. Pull up on water level probes to remove.
4. Clean in place or disconnect wires from water level
probes.
Maintenance
WATER
LEVEL
PROBES
15

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Qf0406a

Table des Matières