Maximum Configuration Level And Functions; Assembly And Installation - Ecolab My Control Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.2

Maximum configuration level and functions

max. number of wash extractors
max. number of dosing pumps and equipment
Dispensing line (WE)
Dispensing line (CBW)
metering valves (WE)
metering points (CBW)
metering valves (CBW)
number of flush valves
empty signal
binary-coded program selection
"mini-terminal" protocol
program selection of time
weight selection of time (CBW)
number of washing machine settings
Max. number of dispensing steps per program (WE)
Max. number of dosages per program (WE)
delayed dosages in wash program
Max. size of wash tunnel
Max. size of infeed conveyor
Rinse water alarm / number of water flow switches
pH control with alarm
pH monitoring with alarm
Temperature information WE
Temperature information CBW
Conductivity control with alarm
Conductivity monitoring with alarm
Water meter WE
Water meter CBW
Product dosage with Z.A.M. (Machine timeout)
4.3

Assembly and Installation

Personnel:
Installation and start-up operations of the dosing system are performed by
Ecolab service technicians, or by authorized service providers of Ecolab.
Startup operations include instructing the customer in operating the dosing system.
The control cabinet is to be mounted on a wall and attached by means of appropriate
fasteners (depending on the type of wall).
Construction, Assembly and Installation
n
Mechanic
Qualified electrician
n
Service personnel
n
n
Specialist
25
16 WE & 2 CBW
24 pumps and 2 ME
12
16
12 per WE
20 valves and direct metering
20
24 (12 x water, 12 x air)
16 (pumps 1 to 14 and 2 x ME)
yes (maximum 99 programs)
yes
yes
yes
99
25
20
yes (0-999) sec.
25 chambers
10 chambers
yes / 6
pH1
pH1 and pH2
1
6
yes
yes
2
6
22 for CBW / 12 for WE
417101971 Rev. 2-02.2019

Publicité

Table des Matières
loading

Table des Matières