2.5
Operation description
(1)
Minilift S underfloor
(2)
Public sewer chamber
(3)
Accumulation height above relief point
30 / 136
(4)
Soffit level of the backwater loop due to siphon effect
(5)
Widening of the backwater loop downstream of the soffit level
016-083