Commissioning; Normal Operation; Servicing/Maintenance/Cleaning; Lubrication - Phoenix Mecano RK ROSE+KRIEGER quad EV Notice D'assemblage

Système tubulaire de l'unité linéaire
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

7.3 Commissioning

Only those persons who have read and understood these installation instructions completely may
start the linear unit.
Forces arise when this linear unit is in operation which can lead to damage to persons or property.
It is imperative that you obey the safety rules and the limits of the linear unit.

7.3.1 Normal operation

Check the linear unit when in operation regularly for correct performance of its function.
In normal operation, look out for detectable changes to the incomplete machine. Should faults
arise, the linear unit is to be shut down immediately in order to avoid damage.
The operating instructions for the complete machine in accordance with Machine Directive 2006/
42/EC are an essential component of a complete machine.

7.4 Servicing/maintenance/cleaning

7.4.1 Lubrication

Before starting any work on the linear unit, any electrical drives used are to be pro-
tected against accidental switching on.
Lubrication is applied directly to spindles.
Lubricant recommendation: off the shelf roller bearing greases, which must not be mixed with
each other.
Lubricating interval: every 200-500 hours run
7. Working life
51

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rk rose+krieger quad av

Table des Matières