Installation of the control unit and connection of the electrical components (siehe "Installing the control unit", Seite 24).
Initial commissioning (siehe "Commissioning", Seite 25).
4.3
Installing the inlet
Install both 45° elbows (1) correctly together w ith the
seal for pipe penetration.
4.4
Installing and removing the pump(s)
Installation
(A)
System (normal installation depth)
(B)
System (low installation depth)
(1)
Fixing screws
Lower the pump(s) carefully into the designated installa-
tion position(s).
Fix the pump(s) in place using the screws (1) (tightening
torque 7 Nm).
Removal
To make removal of the pump from the chamber easier, remove the plug (1) from the pump housing.
Screw in the eye bolt (2) (M8 DIN 580, optional).
Fit a lifting sling to the eye bolt and use this to lift the pump.
010-695_02
Pumping station / Installation and operating instructions
23 / 88