Build Up Of Explosive Mixture; Preventing Leakage; Complete Unit; Pump Unit Delivered Without Motor / Without Sensors - Samson NESE Manuel D'installation Et Mise En Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

 
2.9.3
BUILD UP OF EXPLOSIVE MIXTURE 
Ensure  that  pump  casing  and  mechanical  seal  chamber  are 
 
correctly vented and that pump will not run dry. 
 
Make sure that the pump runs with filled‐in suction and discharge lines 
to avoid build up of an explosive atmosphere. In addition it is essential 
that auxiliary sealing systems are properly filled. 
To  avoid  potential  hazards  from  fugitive  emissions  of  vapor  or  gas  to 
atmosphere the surrounding area should be correctly ventilated. 
 
2.9.4
PREVENTING LEAKAGE 
The pump must only be used to handle the liquids for which it has 
 
been defined. 
 
If  the  pump  is  installed  outdoor,  make  sure  liquid  containing  parts  are 
drained and/or protected against freezing. 
 
If  leakage  of  liquid  to  the  atmosphere  can  result  in  a  hazard  then  a 
leakage detection sensor should be installed. 
2.9.5
COMPLETE UNIT 
ATEX certification for a complete unit according to ATEX Directive 
 
94/9/CE  is  given  according  to  lower  protection  level  of  the 
integrated component. This comment applies particularly to the electric 
motor protection. 
2.9.6
PUMP  UNIT  DELIVERED  WITHOUT  MOTOR  / 
WITHOUT SENSORS 
If  a  partial  delivery  is  required  (electric  motor,  flexible  coupling, 
 
coupling  guard  or  sensor  not  supplied),  an  integration  certificate 
will be established. 
It will be the integrator's responsibility to supply missing parts in order 
to fulfill ATEX requirements for the complete machine. 
2.9.7
COUPLING GUARD 
The  coupling  guard  used  in  a  potentially  ATEX  atmosphere  shall 
 
meet following requirements : 
 
Consist of non‐sparking material (e.g brass), 
Must be made of antistatic material, 
Must be designed in such a way that the rotating parts will not come in 
contact with any part of the guard after a choc. 
2.9.8
MAINTENANCE 
CREATION 
When  a  pump  is  used  in  a  potentially  ATEX  atmosphere  it  is 
 
necessary to check regularly the following parameters and respect 
a  maintenance  plan  to  ensure  that  the  equipment  runs  in  perfect 
technical conditions. 
 
Following regular checks are mandatory : 
No leakage of the shaft seal, 
Ball bearings temperature (on bracket housing surface), 
No cavitations and no abnormal running noises, 
Correct position of isolating valves and function of motorized valves. 
If some parts are worn or working in bad conditions the pump must be 
stopped immediately and put in safety until maintenance operations are 
performed. Origin of default(s) should be eliminated. 
2.9.9
PREVENTING SPARKS CREATION 
Necessary  measures  must  be  taken  to  avoid  sparks  creation  in  case  of 
external impact. 
 
Base  plate  and  pumpset  elements  must  be  properly  grounded.  Ensure 
continuity between components of the group. 
 
It applies to : 
‐Pump hydraulics, 
‐Coupling guard, 
‐Motor frame, 
‐Baseplate. 
 
TO 
AVOID 
HAZARD 
The threaded hole or the earthing plate located on the base plate should 
be used to make proper earthing. 
 
3
TRANSPORT AND STORAGE 
3.1 SAFETY MEASURES 
Never rest below a suspended load. 
 
Keep a safe distance while the load is being transported. 
Check  equipment  weight  and  choose  slings  and  other  lifting  devices 
accordingly. Lifting equipments should be in good conditions. 
Adjust the length of the lifting devices so that pump or/and pumps set 
is moved horizontally. 
Lifting lugs or eyebolts that are sometimes attached to the pump or to 
the motor should not be used to lift a complete pump set. They should 
be used only to lift pump parts during dismantling operations. 
Use the lifting points that are mentioned on the pump set or refer to 
following information. 
 
3.2 DELIVERY 
After  reception  of  goods,  the  delivered  items  must  be  inspected 
for  damage.  Check  that  all  parts  are  present  (check  description 
and  quantities  against  delivery/shipping  documents).  If  any  parts  are 
damaged,  missing  or  if  transportation  damage  is  visible,  this  should  be 
noted on the freight documentation or on the delivery note. 
Do not separate attached documentation from the pump. 
Unpack  the  good  and  eliminate  packaging  according  environmental 
requirements. 
Do  not  remove  caps  from  pump  flanges  if  pump  will  not  be  installed 
immediately. 
 
3.3 SHORT TERM STORAGE 
Leave  piping  connection  caps  fastened  to  keep  dirt  and  foreign 
material out of pump casing during storage. 
If the pump will not be used immediately after delivery, it must be 
stored  in  a  temperate,  dry,  ventilated  location  and  away  from 
vibrations.  Turn  the  pump  shaft  at  intervals  (every  month)  to  avoid 
brinelling  of  the  bearings  and  the  seal  faces  from  sticking.  Close 
protective packing when done. 
If stored as described above, the pump can be stored up to 6 months. 
Consult  SALMSON  for  preservative  procedure  when  a  longer  storage 
period is required. 
 
3.4 HANDLING 
Depending on their design some pumps can fall over before they 
are definitively fastened to the floor. Take all necessary actions to 
ensure that no‐one can be crushed while the equipment is moved. 
A  crane  must  be  used  to  lift  all  equipment  exceeding  25Kg. 
Palettes,  crates  or  boxes  can  be  moved  or  unloaded  by  using  a 
fork‐lift  truck  or  a  hoist  depending  on  lifting  devices  available  on  site. 
Only  suitable  lifting  gear  and  load  carrying  equipment  with  valid  test 
certificates  and  adequate  lifting  capacity  for  the  loads  involved  should 
be  used  to  lift  and  carry  the  goods.  Only  authorized  personal  should 
proceed to pump transportation and they must respect local regulations. 
Weight of goods is indicated on the delivery note. 
Only  use  suitable  lifting  points  that  are  indicated  on  the 
equipment  and  respect  hereafter  lifting  and  transportation  
sketches. Pumps should never be lifted directly with slings. Hooks must 
be used and placed in dedicated lifting holes. Chose proper sling length 
or use a lifting beam. 
 
Lifting a bareshaft  pump : 
  ENGLISH  
 
 

Publicité

Chapitres

Table des Matières
loading

Table des Matières