Running Checks; Shutdown; Maintenance; General Information - Samson NESE Manuel D'installation Et Mise En Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

  ENGLISH  
 
 
  Turn  the  pump  on  and  check  discharge  pressure  increase.  Compare 
this pressure to the shutoff pressure available on the hydraulic curve 
In order to avoid an important overheating of the liquid inside the 
pump  the  pump  should  not  work  more  than  20  to  30  seconds 
against a closed discharge valve. 
 If expected pressure is reached then progressively open the discharge 
valve. 
If  there  is  no  liquid  delivered  or  if  discharge  pressure  is    too  low 
 
then see chapter "trouble shooting".  
 
8.4 RUNNING CHECKS 
During  operation  of  pump  in  duty  conditions  (capacity,  head, 
temperature, ...) the following points must be checked : 
 
 Check and note pump duty point. If necessary convert pressure value 
from bar indicated on the pressure gauge to mwc : 
HMT
 = (P
 x 100) / (SG x 9,806) with SG= fluid Specific Gravity. 
mce
bar
 Check and note current consumption on each phase of the motor. 
 Check calibration of motor protections. 
 Check temperature of ball bearings (on bearing housing surface). 
  Check  flexible  coupling  alignment  after  several  pump  starts  (only  for 
concerned pumps variants). 
 Check tightening of flanges fastening bolts. 
 Check there is no leakage and no abnormal running noise. 
 
When pumping hot fluids, the definitive coupling alignment should 
 
be  done  only  when  system  nominal  temperature  is  reached  and 
stabilized. See chapter 7.1.4 COUPLING ALIGNMENT 
 
Check the surface temperature on the bearing bracket and on the 
 
pump  casing.  Check  pumped  fluid  temperature.  Alarm  and  stop 
trips  settings  should  be  done  according  those  values.  Refer  to  specific 
sensors IOM before adjusting those trips. 
 
8.5 SHUTDOWN 
Before the pump is stopped close the discharge isolating valve. 
Ensure  that  the  pump  runs  in  that  condition  no  more  than  few 
 
seconds. 
When  the  pump  has  come  to  a  standstill  :  close  the  suction  isolating 
valve. If the pump is equipped with auxiliary systems such as a quench, 
heating system, flushing, external lubrication, etc ... it must be closed at 
the last step. 
 
If temperature is likely to drop below freezing point, pump casing 
 
and auxiliary connected systems should be completely drained or 
otherwise  protected.  For  prolonged  shut‐downs  an  adapted  rust 
protective  coating  should  be  applied  to  the  inside  and  outside  of  the 
pump. 
 
Pumping  explosive,  toxic  or  polluting  fluids  :  make  sure  that  all 
necessary actions were taken to avoid the creation of a hazard for 
people or environment during drainage operations. 
 
Products  which  are  sent  back  to  Salmson  must  be  drained  and 
 
cleaned.  Pumped  fluid  should  be  completely  removed  from  the 
pump. 
 
9
MAINTENANCE 
9.1 GENERAL INFORMATION 
Only  properly  trained  and  skilled  staff  should  undertake 
 
maintenance operations. 
 Only  authorized  personnel  should  undertake  maintenance  on 
 
ATEX  certified  equipments.  Make  sure  to  avoid  creation  of 
explosion hazard while proceeding to maintenance in a ATEX zone. 
All technical documents delivered with the pump should be known 
 
and should be available near the pump. 
The maintenance crew should be informed about the risks linked to the 
use of the pump and to the pumped fluids before they can start working 
on  the  equipment  (dangerous  products,  fluid  and  pump  temperature, 
pressurized  parts,  ...).  They  should  be  equipped  with  all  appropriated 
individual safety protections (glasses, gloves, ...) and should respect local 
industrial and security rules. 
Pump  contains  a  part  of  pumped  fluid  even  when  it  is  at  a 
standstill.  Drain  and  flush  pump  casing  with  care  before  starting 
pump disassembly. 
 
Appropriate lifting devices should be available to help personnel moving 
heavy loads. 
 
The maintenance area must be clearly identified. Install warning boards 
with the words « WARNING : machine under repair ! »  on the pump and 
on the control cabinet. 
 
Any  work  on  the  machine  must  be  performed  when  pump  is 
stopped.  Prior  to  any  maintenance  or  repair  work  the  motor 
should  be  electrically  isolated  and  secured  against  uncontrolled  start. 
Lock the main switch open and disconnect circuit breaker. Withdraw the 
fuses if any. 
 
WARNING : electrical equipments that must be powered on during the 
maintenance work or pressurized equipments must be clearly identified. 
 
End of maintenance operations : all protective parts that were removed 
before maintenance should be reinstalled and all security devices should 
be reactivated. Pump surrounding area should be cleaned. 
 
9.2 MAINTENANCE 
INSPECTIONS SCHEDULE 
It is recommended to build up a maintenance and inspection plan 
to  ensure  a  reliable  use  of  pump  and  to  reduce  malfunctions 
hazards. Following check points should be included in this maintenance 
plan : 
 Check state and working of securities and auxiliary systems, 
 Check and adjust gland packing (if any) for visible leakage, 
 Check for any leaks from pump gaskets and flanges seals, 
  Check  lubricant  level  and  aspect  of  oil  (oil  lubricated  bearings)  in 
bearing bracket, 
  Check  running  time  and  replacement  frequency  of  lubricants  /  ball 
bearings, 
  Check  the  bearing  bracket  housing  surface  temperature  on  ball 
bearings area, 
 Check dirt and dust is removed from pump and motor , 
 Check coupling alignment (depending on pump variant), 
  Check  if  there  is  unusual  noises  (cavitations,  hissing,  purring,  ...)  or 
excessive vibrations. 
 
Check point 
State of the auxiliary systems 
Motor 
Shaft sealing 
Leaks from gaskets 
Oil level and grease quantities 
Lubricants (ball bearings) 
Bearings surface temperature 
Cleaning 
Alignment and coupling wear 
Noise, vibrations 
Anchoring quality 
Those frequencies are given for information only. They could be used as 
a  basis  to  the  creation  of  a  maintenance  plan  when  starting  a  new 
installation.  Depending  on  installation  conditions  and  use,  the 
periodicity will be shortened or prolonged. 
9.2.1
LUBRICATION 
The ball bearing is lubricated with a lithium‐saponified grease free 
from resins and acids and with anti‐rusting agents (K3K DIN51825) 
taken from following list or equivalent : 
Klüber Microlube GL 261 (Standard) 
Shell Aerogrease 16 
Esso Unirex N3 
 
Properties  
 Consistency according to DIN 51818, class 1 (NLGI1) 
 Worked penetration according to DIN ISO 2137 (0,1 mm) 310‐340 
 Service temperature : 140°C 
 Dropping point : 250°C according to DIN ISO 2176 
14 
AND 
PERIODIC 
Periodicity 
Depends on equipment type. See 
dedicated equipment IOM 
See manufacturer IOM 
Weekly 
Weekly 
Daily / Weekly / Monthly 
Replacement frequency according ball 
bearing type and shaft speed 
Monthly 
Twice a year 
Twice a year 
Monthly 
Yearly 

Publicité

Chapitres

Table des Matières
loading

Table des Matières