Installation Considerations - Danfoss ADAP-KOOL AKC 114 G Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation considerations

AKC 114G
Accidental damage, poor installation, or site conditions, can give rise to malfunctions of the
control system, and ultimately lead to a plant breakdown.
Every possible safeguard is incorporated into our products to prevent this. However, a wrong
installation, for example, could still present problems. Electronic controls are no substitute for
normal, good engineering practice.
Danfoss wil not be responsible for any goods, or plant components, damaged as a result of
the above defects. It is the installer's responsibility to check the installation thoroughly, and to
fit the necessary safety devices.
Particular attention is drawn to the need for a "force closing" signal to controllers in the event
of compressor stoppage, and to the requirement for suction line accumulators.
Your local Danfoss agent will be pleased to assist with further advice, etc.
Function description RC.8A.R1.02 © Danfoss 10/2001
27

Publicité

Table des Matières
loading

Table des Matières