ETATRON D.S. eTwin Notice D'installation, Emploi Et Entretien page 46

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 69
The probe connectors are located at the bottom of the device as shown in
Fig. 7 – Opening terminal board cover and position of probe connectors
. Set-points 1 and 2 are always matched respectively to measuring channels 1 and 2 on all eTwin pump models and
versions.
Once the cables are connected, close the cover and delicately pull any extra cable out through the cable glands. ATTENTION:
tighten the gasket as much as possible but not excessively so as not to damage the plastic screws.
The following table shows the allocations of measuring channels 1 and 2 according to your eTwin version.
Right side terminal block J17
No.
1
2
RS485 (not enabled)
3
4
5
Pump 1 Level Probe Input (-)
6
Pump 1 Level Probe Input (+)
7
Pump 2 Level Probe Input (-)
8
Pump 2 Level Probe Input (+)
9
Proximity Sensor Input (-)
10
Proximity Sensor Input (+)
11
External command (-)
12
External command (+)
13
mA output (-)
14
mA output (+)
15
PT100 input (-)
16
PT100 input (+)
17
+5V power supply. Chlorine pot. probe
18
+5V power supply. Chlorine pot. probe
ENGLISH
46
Measurement - Version
Measurement 1
Measurement 2
Table 1 -Configuration of measurement channels of different eTwin versions
Description
pH - Rx
Chlorine - pH
pH
Chlorine
Rx
pH
Fig. 8 – RIGHT terminal block J17
pH - pH
pH
pH

Publicité

Table des Matières
loading

Table des Matières