1 Clamp
2 CDI unit/ignition coil
3 Spark plug cap
4 CDI magneto
5 Oil level switch
6 Oil level switch clamp
7 Grommet
WIRE ROUTING DIAGRAM
å Clamp the high tension cord.
∫ Twist the high tension cord in until it comes in con-
tact with the spark plug cap.
ç Connect the CDI magneto lead wire so that it is not
slack or caught.
∂ Spark plug cap installation area
´ Bend the lead wire of the oil level switch as shown,
and clamp it.
ƒ To control box
© Push the lead wire grommet of the oil level switch
against the gray tube.
˙ Pass the lead wire of the oil level switch as shown.
7-22
SPEC