o) Canopy
The canopy frame (1) is already glued together ex works
and applied with a magnetic quick-closure (2).
The canopy glazing (3) must be attached to the canopy
frame with 30-minute epoxy resin.
To lift off the canopy that is placed on the fuselage,
take it on the left and right of the rear part of the canopy
(5), push the canopy forward (A) until the safety hooks
(4) unlock and lift the canopy off upward (B).
Figure 11
38