Maico MDR EC Série Notice De Montage Et Mode D'emploi page 85

Tourelles d'extraction
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

MDR .. EC
the plug of the cable screw connections
[10] and open it according to the thickness
of the earth conductor. Lead the earth con-
ductor from below through the cable screw
connections [10] and grommet [15] up to
the stud bolt [16]. Close the cable screw
connection [10]. NOTICE: Ensure tightness –
otherwise moisture and risk of corrosion.
4. Connect flexible sleeve to the folded
spiral-seams duct. NOTICE: Ensure seal
integrity. For MDR-PG variants do not kink
tubes.
5. Screw the MDR roof flashing to the flat
roof (Fig. B, position [X]). Provide suitable
mounting material (4 screws, tightening
torque 20 Nm).
6. Complete "external earthing connection"
(Fig D). The required mounting material is
located on the stud bolts [16] Provide the
earth conductor with a cable lug (provided
by customer) and screw the earth con-
ductor to the stud bolt [16]. NOTICE: For a
secure contact, place the tooth lock washer
under the cable lug, place the washer over
the cable lug and tighten with the lock nut
FIG
DE
UK
VENTILATOREN
FR

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mdr 18 ecMdr 22 ecMdr 25 ecMdr 31 ecMdr 35 ec

Table des Matières