MDR .. EC
1. Wire the fan electrically according to the
wiring diagram
corresponding wiring diagram in the appen-
dix. Tightening torque of terminals
1 Nm. Ensure PE conductor connection.
2. Check that the technical data (
plate) matches.
3. Fit terminal box/service switch cover and
screw it on. NOTICE: Risk of short-circuits if
terminal box not watertight. Ensure correct
cable screw connections and tight elbows/
cable screw connections/blind plugs.
4. Switch the mains fuse on.
5. Commissioning MDR unit:
• Service switch in position (1/On).
• For MDR-PG variants, adjust the
setpoints on the pressure controller
Chapter 13.
• For MDR-VG variants, set the setpoint on
the speed setpoint generator
14.
6. Fit roof [1] and screw it with both ring nuts
[2] – tightening torque 10 Nm.
FIG
Sticker in terminal box or
DE
rating
Chapter
UK
VENTILATOREN
FR