Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Notice SecurAccess PMR
To prevent from electric shocks, do not remove rubber line cord entries
inside the case.
!
Those ports are designed to be connected on a TRT3 (TNV-3) network
in accordance with EN 60950-1 : 2006 specifications.
!

1.2. Mounting layouts

See following pages
Installation, line connection and configuration should be done by qualified
personnel. All operations requiring an opening of the unit should be done
carefully in order to prevent from potential electric shocks.
Cases come out of factory with pre drilled holes to ensure proper ventilation.
Do not fill those holes
31

Publicité

Table des Matières
loading

Table des Matières