Installation
Illustration 2.24 DC Connection Area
1.
On the inverter or string combiner turn the PV
load switch into off position.
2.
Connect the PV cables from the external string
combiner to the inverter. Ensure correct polarity,
see Illustration 2.25.
3.
All wires must be properly fastened with the
correct torque. See 5.5 Torque Specifications.
Illustration 2.25 Connect to PV Input
Illustration 2.26 DC Label

2.10 Closure

1.
2.
L00410644-01_2q / Rev. date: 2014-06-02
Close the cover of the inverter installation area.
Fasten the 3 front screws. See 5.5 Torque Specifi-
cations.
Turn on AC power.