Electrical Wiring - BWT PRO A Notice D'installation Et Conseils D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Aperture for
fastening the eye
to the wall
Hold the template against the wall at the selected installation site, and drill in the 4 locations indicated by
the template using a 5 mm diameter drill bit. Push the bushings into the holes and screw a round head
screw into each bushing leaving it to protrude slightly. Hang the panel on the round head screws using the
suspension eye holes.
!
Do not obstruct the flow of air behind the panel that allows cooling.
!
Do not install the control panel in a cupboard or other location with inadequate ventilation, this could
lead to overheating of the control panel and a risk of fire.
4.3

Electrical wiring

Wire the control panel in as follows;
Connect the cell and the gas sensor to the control panel. NEVER MODIFY OR EXTEND THE CABLES;
TRAITEMENT DE L'EAU
Aperture for
fastening the eye
to the panel
2021/03 - Indice de révision : B Code : 29740
BWT
39/88

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pro ls

Table des Matières