Assembly Recommendations; Required Assembly Conditions; Assembly Procedure For Ssj And Ssp Doors; Assembly Procedure For Sst Doors - Wisniowski UNIPRO Notice De Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 15
[A000005] 4. ASSEMBLY RECOMMENDATIONS
Prior to assemble and operate the door, the guidelines contained in this instruction
should be read carefully. All assembling and operating instructions must be strictly
observed. It ensures the correct assembly, and durable and failure-free operation.
All works related to door assembly must be carried out in described order.
[A000006] 5. REQUIRED ASSEMBLY CONDITIONS
The door should be used and operated in compliance with its intended use.
Selection and application of doors in construction industry should be based on
technical documentation of the facility developed in compliance with regula-
tions and standards in force.
[B000005] The doors can be mounted to reinforced concrete walls, those
made of bricks, or steel frameworks. A room intended to mount the doors should
be finished completely (plastered walls, finished floor), walls must not have any
faults in quality of work. The room should be dry and free of chemicals being
harmful for coating paints.
Both side walls, and frontal wall and door assembly opening lintel must be verti-
cal and perpendicular to the floor, and must be finished.
It is prohibited to install the door in a room in which fin-
ishing works are still to be done (plastering, gypsum fin-
ishing, grinding, painting, etc.).
Floor in bottom sealing area must be levelled and constructed in such a way
as to ensure free water drain. Appropriate ventilation (drying) of garage must
be ensured.
• Installing of electrical drive unit to the door by profes-
sional installer or competent person is to be done ac-
cording to the Assembly and Operating Instruction of
the drive unit.
• [C000184] It is prohibited to open the door leaf if the
guides are not mounted.
[B000092] The area to install the door should be free from any pipes, cables, etc.
[D000005] 6. ASSEMBLY PROCEDURE FOR SSj AND SSp DOORS
Activities which must be performed by Professional Installer or Competent person.
Please keep the list of garage door's component parts (specification).
Prior to installation works, check the dimensions (width and height) of the as-
sembly opening. Carefully perform further installation as shown on the Figures.
The maximum torque for tightening sheet metal screws to the panel is 7÷9 [Nm].
When this torque is exceeded, the connection can be broken.
Fig. 20
Fasten the mounting plate in the middle of the assembly opening.
The plate must be fastened to the lintel with 4 screws. When install-
ing the SSj door with one long spring, the mounting plate should be
shifted in relation to the middle of the opening. The relevant distance
between the spring and cable drum should be observed (fig. 40).
Fig. 30
When the guides are installed, check the diagonals as shown on the
Figure. The difference of the diagonals should be max ± 3 [mm].
Fig. 35
Exploded view of the winch shaft with one or two springs. It is criti-
cal to observe the colour marking of drums and springs during its
assembly on the winch.
Fig. 45.1b
A pull to lower the door should be assembled in such a way as to
prevent its lateral movements.
Fig. 50.1a and b When winding up the cable on a drum, ensure that minimum
two cable revolutions remain on a drum, when the door is in its
ultimate closed position.
Fig. 55
When installing panels, the clearance of 1 to 2 [mm] should be
ensured between panels. In order to ensure a proper gap be-
tween panels, approx. 2 [mm] thick cardboard pieces should be
inserted between panels near each hinge.
Fig. 70
Cardboard pieces should be removed during door opening,
when the panels are bent towards each other.
Fig. 80
Top roller bracket should be mounted to ensure that the roller con-
tacts the lower part of the guide.
Fig. 85.3c
Place the lock bracket to the frame at the level where the lock is
mounted to the panel, and mark out the holes. Holes should be
made with the 8,5 [mm] drill.
Fig. 90
On the lock side, bolt the rod slightly to ensure its free movement.
On the bolt side, provide fast joining. Glue the rod plastic holders
to the panel. If necessary, the rod plastic holders may be screwed.
Fig. 95
Tighten the springs according to the SPRING TIGHTENING
RULES.
Fig. 105.1
After mounting, cut the protruding parts of the brackets, blunt its
edges and protect the edges with paint.
Fig. 105.3
Unblock the spring break device.
Fig. 105
Before operating the door, lubricate all hinges, rollers and springs
Technical description
IIiO/BS/UniPro/05/2014/ID-91262
Assembly and Operating Instructions – Sectional garage door UniPro
with, e.g. semi-solid HWS-100 Wurth grease.
Fig. 110
For manually operated doors with Ho>2200 [mm], mount the
cord facilitating the door closing.
Fig. A
When mounting a drive, block the door bolts in its open position.
Fig. O5.
Installation of three-point lock in a wicket door.
[D000010] 6.1. ASSEMBLY PROCEDURE FOR SSt DOORS
Activities which must be performed by Professional Installer or Competent person.
Please keep the list of garage door's component parts (specification).
Prior to installation works, check the dimensions (width and height) of the as-
sembly opening. Carefully perform further installation as shown on the Figures.
The maximum torque for tightening sheet metal screws to the panel is 7÷9 [Nm].
When this torque is exceeded, the connection can be broken.
Fig. 30
When the guides are installed, check the diagonals as shown on the
Figure. The difference of the diagonals should be max ± 3 [mm].
Fig. 35
Exploded view of the winch shaft with one or two springs.
Fig. 40
Do not install the additional bracket in the middle of the connec-
tion profile to ensure the place for a drive.
Fig. 45.1b
A pull to lower the door should be assembled in such a way as to
prevent its lateral movements.
Fig. 50.2a
When winding up the cable on a drum, ensure that minimum two
cable revolutions remain on a drum, when the door is in its ultimate
closed position.
Fig. 50.3
Provide each roller with spacer sleeve. Ensure that the cable is
located between the roller and frame (the cable should lie on the
roller).
Fig. 55
When installing panels, the clearance of 1 to 2 [mm] should be
ensured between panels. In order to ensure a proper gap be-
tween panels, approx. 2 [mm] thick cardboard pieces should be
inserted between panels near each hinge.
Fig. 70
Cardboard pieces should be removed during door opening,
when the panels are bent towards each other.
Fig. 80
Top roller bracket should be mounted to ensure that the roller con-
tacts the lower part of the guide.
Fig. 85.3c
Place the lock bracket to the frame at the level where the lock is
mounted to the panel, and mark out the holes. Holes should be
made with the 8,5 [mm] drill.
Fig. 90
On the lock side, bolt the rod slightly to ensure its free movement.
On the bolt side, provide fast joining. Glue the rod plastic hold-
ers to the panel. If necessary, the rod plastic holders may be
screwed.
Fig. 105.1
After mounting, cut the protruding parts of the brackets, blunt its
edges and protect the edges with paint.
Fig. 105.3
Unblock the spring break device.
Fig. 105
Before operating the door, lubricate all hinges, rollers and springs
with, e.g. semi-solid HWS-100 Wurth grease.
Fig. 110
For manually operated doors with Ho>2200 [mm], mount the
cord facilitating the door closing.
Fig. A
When mounting a drive, block the door bolts in its open position.
Fig. O5.
Installation of three-point lock in a wicket door.
[D000015] 6.2. ASSEMBLY PROCEDURE FOR SN DOORS
Activities which must be performed by Professional Installer or Competent person.
Please keep the list of garage door's component parts (specification).
Prior to installation works, check the dimensions (width and height) of the as-
sembly opening. Carefully perform further installation as shown on the Figures.
The maximum torque for tightening sheet metal screws to the panel is 7÷9 [Nm].
When this torque is exceeded, the connection can be broken.
Fig. 10.1a
Bolt the back connection profile to the top roller bracket from in-
side to receive the so called mounting frame.
Fig. 30
When the guides are installed, check the diagonals as shown on the
Figure. The difference of the diagonals should be max ± 3 [mm].
Fig. 45.2b
A pull to lower the door should be assembled in such a way as to
prevent its lateral movements.
Fig. 55
When installing panels, the clearance of 1 to 2 [mm] should be
ensured between panels. In order to ensure a proper gap be-
tween panels, approx. 2 [mm] thick cardboard pieces should be
inserted between panels near each hinge.
Fig. 70
Cardboard pieces should be removed during door opening,
when the panels are bent towards each other.
Fig. 80
Top roller bracket should be mounted to ensure that the roller con-
tacts the lower part of the guide.
Fig. 85.3c
Place the lock bracket to the frame at the level where the lock is
mounted to the panel, and mark out the holes. Holes should be
made with the 8,5 [mm] drill.
Fig. 90
On the lock side, bolt the rod slightly to ensure its free movement.
On the bolt side, provide fast joining. Glue the rod plastic holders to
the panel. If necessary, the rod plastic holders may be screwed.
EN
3

Hide quick links:

Publicité

Table des Matières
loading

Table des Matières