6
Start-up and operation
6.1
Start-up
Check before the initial start-up
Ensure that the base plate of the MultiControl has been correctly attached to the profile, that the MultiControl
¾
has been correctly attached to the base plate and that all screws have been properly tightened.
Ensure that no additional hazards are formed through the interfaces to other components.
¾
Ensure that the wiring conforms to the specifications and legal provisions.
¾
Check all protective equipment.
¾
Ensure that no persons are in the hazardous areas by the conveyor system.
¾
6.2
Configuration options
CAUTION
Risk of malfunction!
Change the motor configuration via SDO or web browser only when motors are stopped!
¾
The MultiControl must be configured before it can be started up. There are various ways of doing this:
• All settings can be configured via a web-based user interface on a computer connected to the MultiControl.
• Directly on the MultiControl via the built-in magnetic sensor (see the "MultiControl / RollerDrive - Start-up and
Programming" supplement).
• All settings except the bus type can be configured via service data objects (SDOs) written by a higher-level control
system (see the "MultiControl / RollerDrive - Start-up and Programming" supplement).
• The station name, the IP configuration and the connection settings can be modified via a PLC development
environment.
• The data is automatically transferred by the Plug&Play function when the MultiControl is replaced.
NOTE
Possible loss of data during the start process
If the supply voltage is interrupted during the start process, this can result in a loss of data.
Do not switch off the supply voltage during the start process (approx. 10 seconds).
¾
Version 2.7 (05/2021) UL
Translation of the original operating manual
Start-up and operation
31 of 140