Schiller Argus VCM Mode D'emploi page 60

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Temperature Monitoring
Probe Decontamination Procedure
1. Wipe the probe with a cloth dampened with warm water and a mild detergent
solution.
2. Clean the probe with either 70% isopropyl alcohol or a 10% solution of chlorine bleach.
3. Remove the probe from the probe well.
4. Thoroughly dry all surfaces.
5. Reassemble the thermometer components.
6. Reconnect the probe latching connector to the thermometer, making sure that the
connector snaps into place.
7. Reinstall the probe well into the monitor.
8. Insert the probe into the probe well.
Note: You can also replace any components of the thermometer. For the safety of patients,
and to ensure the best product performance and accuracy, use only parts recommended
by the manufacturer.
54
ARGUS VCM
Unplug the latching probe connector from the thermometer.
Clean the inner surface of the probe well by swabbing with a cloth dampened
with 70% isopropyl alcohol or a 10% solution of chlorine bleach. You can
immerse the probe well during cleaning.
Operator's Manual
ARGUS VCM

Publicité

Table des Matières
loading

Table des Matières