3. Installation

The following chapter describes how to install the bed.
WARNING
If the power supply cord or plug is damaged, the complete assembly must be replaced
by authorised service personnel. Do not remove the fitted plug, or use a rewireable
plug or adapter.
Make sure the power supply cord is not stretched, kinked or crushed.
Do not allow the power supply cord to trail on the floor where it may cause a trip
hazard.
Make sure the power supply cord does not become entangled with moving parts of
the bed or trapped between the bed frame and head board.
Disconnect the power supply cord from the electricity supply, and store it as shown,
before moving the bed.
Before the first use, or if the bed has been unused for more than three months, read
and understand this IFU and test the functionality of the bed to verify correct
operation. Refer to "Preventive maintenance" on page 49 for a list of functional tests.
CAUTION
Before the first use, or if the bed has been unused for more than three months,
connect the bed to the electricity supply for at least 24 hours to allow the backup
battery to recharge fully; failure to do this may reduce the life of the battery. After
charging, check that the battery is fully serviceable by carrying out a battery test as
shown on page 51.